Village, street, sdm, clean, CC street – residents will soon get rid of the mud, CC is made from 25 lakhs

hear the news

hear the news

Kadaura. CC Road and Drain will soon be built in Mohalla Islamabad for Rs 25 lakh. After construction, people are freed from waterlogging and dirt in the rainy season.
It should be noted that the demand for the construction of CC and drainage has long been made by the local population. Every time it rained, water filled the houses. In this episode, on Wednesday, on the instructions of Nagar Panchayat EO Sunil Kumar Singh, Junior Engineer Brijendra Kumar inspected the site. He instructed that the platforms and walls that were obstructing road construction be removed and that the cattle tied to the doors be moved to other locations. Nagar Panchayat staff were also asked to draw up a list of the intruders so that action could be taken against them. Haji Majeed Khan from Rahmat Khan said that the mud and waterlogging were on the dirt road in the rainy season. That makes it difficult for people to leave. Junior engineer Brijendra Kumar said that after measuring 150 meters, she was sent to the Duda Department for CC and sewer construction. After approval, work will begin shortly. Interventions in the place are eliminated. Bablu Aggarwal, Irfan Khan, Shivshankar, Bharat Singh, Dileep etc. were present.

Kadaura. CC Road and Drain will soon be built in Mohalla Islamabad for Rs 25 lakh. After construction, people are freed from waterlogging and dirt in the rainy season.

It should be noted that the demand for the construction of CC and drainage has long been made by the local population. Every time it rained, water filled the houses. In this episode, on Wednesday, on the instructions of Nagar Panchayat EO Sunil Kumar Singh Junior Engineer Brijendra Kumar, inspected the site. He instructed that the platforms and walls that were obstructing road construction be removed and that the cattle tied to the doors be moved to other locations. Nagar Panchayat staff were also asked to draw up a list of the intruders so that action could be taken against them. Haji Majeed Khan from Rahmat Khan said that the mud and waterlogging were on the dirt road in the rainy season. That makes it difficult for people to leave. Junior engineer Brijendra Kumar said that after measuring 150 meters, she was sent to the Duda Department for CC and sewer construction. After approval, work will begin shortly. Interventions in the place are eliminated. Bablu Aggarwal, Irfan Khan, Shivshankar, Bharat Singh, Dileep etc. were present.

.

( News Source – Amar Ujala )

Be the first to comment

Leave a Reply