Overhead tank will be established in 62 villages

{“_id”: “60f862f08ebc3e79b36d5705”, “slug”: “Overhead-tank-will-be-published-in-62-villages-khalilabad-news-gkp4027117124 -“, “type”: “story”, “status”: ” “,” title_hn “:” 62 u0930 u093e u091c u0938 u094d u0935 u0917 u093e u0902 u0935 u094b u0902 u0915 u0940 u0921 u0947 u0922 u0947 u0922 u0947 u0922 u0947 u0922 u0947 u0922 u0947 u0922 u092 u093e u0915 u0940 u0906 u092c u093e u0926 u0940 u0915 u094b u092e u093f u0932 u0947 u0917 u093e u091f u094b u091 “category u0915 u091” category : {“title”: “City & States”, “title_hn”: ” u0936 u0939 u0930 u0914 u0930 u0930 u093e u091c u094d u092f”, “slug”: “City-and-States” }}

hear the news

hear the news

One and a half lakh population of 62 income villages will get water
Free land is not available in 232 villages out of 402 identified villages affected by JE, AES
Jal Nigam already works in 32 villages owned by JE, AES. are affected
Amar Ujala office
Sant Kabir Nagar. A population of 1.5 lakh in 62 high-income villages with 29 grams of panchayats in the district will be given drinking water to drink. The government approved this. It is expected that work organization will also start working soon.
The government takes the prevention of JE, AES very seriously. To this end, priority was given to instructions to provide the villagers with clean water by laying pipelines in the identified villages affected by JE, AES. Incidentally, 402 villages in the district are marked as JE, AES affected. Jal Nigam has already built water tanks in 32 villages. While no free land is available in 232 villages affected by JE, AES. Incidentally, a proposal has been sent to the government to lay pipelines in 62 capture villages of 29 JE, AES-affected gram panchayats. These include Jivadhara, Munderi, Belwa Sengar, Punaya, Patnakhas, Dabra, Jaswal, Banauli, Koilbhar, Badhya, Sukrauli, Jorwa, Bhatpurwa Darghat, Bhatauli, Bharpurwa, Utrawal, Mahori etc. Ajay Kumar Upadhyay, XEN, responsible for Jal Nigam, said the path was cleared for pipeline laying in 29-gram panchayats. In every gram of panchayat there is a project of about three crores. Megha Engineering and Infrastructure Limited Hyderabad has been named by the government as the executive body. This institution has done the best drinking water work in Telangana state. First of all, the proposal to lay the pipeline in JE, AES affected villages with priority on free land availability is to be prepared. In addition, if the population of Scheduled Castes and Scheduled Tribes is high, or villages from MP Model Village and Aspirational Selected Blocks can optionally be included. CDO Atul Mishra announced that water tanks will be built in 29-gram panchayats. Pipeline is being laid. Pump is being installed. About 1.5 lakh population of 62 income villages of these gram panchayats are benefited. It is true that most of the villages affected by JE / AES do not have free public land. The help of the administration is used for this.

One and a half lakh population of 62 income villages will get water

Free land is not available in 232 villages out of 402 identified villages affected by JE, AES

Jal Nigam already works in 32 villages owned by JE, AES. are affected

Amar Ujala office

Sant Kabir Nagar. A population of 1.5 lakh in 62 high-income villages with 29 grams of panchayats in the district will be given drinking water to drink. The government approved this. It is expected that work organization will also start working soon.

The government takes the prevention of JE, AES very seriously. To this end, priority was given to instructions to provide the villagers with clean water by laying pipelines in the identified villages affected by JE, AES. Incidentally, 402 villages in the district are marked as JE, AES affected. Jal Nigam has already built water tanks in 32 villages. While no free land is available in 232 villages affected by JE, AES. Incidentally, a proposal has been sent to the government to lay pipelines in 62 capture villages of 29 JE, AES-affected gram panchayats. These include Jivadhara, Munderi, Belwa Sengar, Punaya, Patnakhas, Dabra, Jaswal, Banauli, Koilbhar, Badhya, Sukrauli, Jorwa, Bhatpurwa Darghat, Bhatauli, Bharpurwa, Utrawal, Mahori etc. Ajay Kumar Upadhyay, XEN, responsible for Jal Nigam, said the path was cleared for pipeline laying in 29-gram panchayats. In every gram of panchayat there is a project of about three crores. Megha Engineering and Infrastructure Limited Hyderabad has been named by the government as the executive body. This institution has done the best drinking water work in Telangana state. First of all, a proposal is to be made for laying pipelines in JE, AES affected villages with priority on the free availability of land. In addition, if the population of Scheduled Castes and Scheduled Tribes is high, or villages from MP Model Village and Aspirational Selected Blocks can optionally be included. CDO Atul Mishra announced that water tanks will be built in 29-gram panchayats. The pipeline is being laid. Pump is being installed. About 1.5 lakh population of 62 income villages of these gram panchayats are benefited. It is true that most of the villages affected by JE / AES do not have free public land. The help of the administration is used for this.

    .

( News Source – Amar Ujala )

Be the first to comment

Leave a Reply